Switchgear
Stage 2 · Pulled backBig electrical panels for data centers and the grid. Lead times 52 to 104 weeks; record orders.
Fear: Orders come in lumps.
Nuclear and grid shortage
Enrichment price near $200 per unit. Russian supply waivers end Jan 2028; new US plants 2029 or later.
More signals means a tighter squeeze. How the signals work.
| BWXT BWX Technologies | Stage 2 · Pulled back | $137.00 | $133.21 – $241.82 | 43% | $222.07 | $162.09 | $81.50 |
| CCJ Cameco | Stage 2 · Pulled back | $86.67 | $77.70 – $135.24 | 36% | $126.85 | $146.36 | $74.75 |
| LEU Centrus Energy | Stage 2 · Pulled back | $139.49 | $135.85 – $464.25 | 70% | $247.40 | $177.36 | $66.75 |
Range bar: the dark tick is the price between the 12-month low (left) and high (right). The green tick is the analysts' average 12-month target, capped at the high. Good case uses that target. Bad case is a 2022-style slump: a 25% market drop scaled by the stock's beta (floor 0.5; 2.5 where beta is missing). Event stocks use an "event fails" estimate. These are what-if numbers, not predictions.
Enrichment price near $200 per unit. Russian supply waivers end Jan 2028; new US plants 2029 or later.
Stage 2, Pulled back: the shortage is real, but the stocks fell on one specific fear. It scores 6 of 6 shortage signals.
Utilities paused new contracts; nuclear startups crashed and dragged the group.
Jan 2028 waiver end.
Big electrical panels for data centers and the grid. Lead times 52 to 104 weeks; record orders.
Fear: Orders come in lumps.
Engines that push natural gas through pipes. 160-week lead times; Kodiak sold out.
Fear: Low natural gas prices.
Crews that build lines and substations.
Fear: Already near highs.